Part Number | Tube Size | Stem Size | Bag QTY | Box QTY |
TTEU1010M | 10mm | 10mm | 10 | 800 |
TTEU1015M | 10mm | 15mm | 10 | 540 |
TTEU1515M | 15mm | 15mm | 10 | 250 |
TTEU2222M | 22mm | 22mm | 5 | 200 |
Instructions for use:
- Push pipe insert into squarely cut tube and remove all burrs.
- Ensure cap screw is in the open position, the coloured ring will be visible.
- Push the fitting onto the end of the tubing until it reaches the tube stop.
- Twist the screw cap until the coloured ring is no longer visible.
Application | Operating Temperature | Maximum Temperature | Maximum Working Pressure |
Cold Water | 20 C | 20 C | 12 bar |
Hot Water | 65 C | 95 C | 6 bar |
Central Heating | 82 C | 105 C | 3 bar |
For full technical and installation information please download the Installation Guide
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish.Accept Reject Read More Privacy & Cookies Policy
error: Content is protected !!